The new subsea fiber-optic communication line will connect Sakhalin with Magadan and Kamchatka regions. Its total length will be over 2,000 km. Maximal system capacity is 400 Gbps in each destination with an increase option up to 8 Tbps. The facility is scheduled for commissioning in June 2016.