Xtera deployed its multi-purpose Nu-Wave Optima platform in submarine and terrestrial line terminal equipment configurations delivering 100G waves in both the subsea and land sections of the 5,000-km Zafarana-to-Milan route.
Xtera deployed its multi-purpose Nu-Wave Optima platform in submarine and terrestrial line terminal equipment configurations delivering 100G waves in both the subsea and land sections of the 5,000-km Zafarana-to-Milan route.